Wednesday, December 19, 2007

Building Project Committee update

Today I met with representatives from the MLK building project committee including representatives from Barton Mallow, Mitchell and Mouat Architects, TMP Architecture, AAPS district representatives, and MLK teacher Karen Haddas.  Our meeting was the second meeting this year to plan for the 2005 bond identified building renovations at MLK.  The work will include all of the following:
- electrical upgrades
- installation of a new security system
- replacement of classroom flooring
- updating of all bathrooms in the building
- installation of lockers in hallways
- replace cabinetry and sinks in classrooms
- reconfigure drop off area in front of school to better insure safety of students
- replace heating system
- install wireless infrastructure

The exciting part:  Conceptual Drawings!  At this point, I have conceptual drawings from the architects of what would be done at MLK . . . so . . . it is time to share the concepts and offer any final input on the concepts.  With this goal in mind, I've left the drawings and the design specifications in the school office conference room.  Please feel free to look them over.  In addition, I will be available to share them on Thursday, December 20 from 11:30 to 1 and on Friday, December 21 from 9 to 10.  I hope to see you at one of the meetings.


Wednesday, December 05, 2007

Building Project Committee

  • Building Project Committee
    • next meeting December 19 at 11 AM
    • BPC memebers--
      • MLK:
        • Alicia Faciane, PTO co-president
        • Karen Haddas, teacher
        • Elizabeth Donovan, School Improvement Team parent
        • Kevin Karr, MLK principal
      • AAPS:
        • Randy Trent, Executive director of physical properties
        • Henry Caudle, Administrator for Comprehensive School Improvement Plan
      • John Mouat, architect, Mitchell and Mouat Architects
      • Nandita Mishra, architect, TMP Architecture
      • Arlene Samuel, design manager, Barton Malow Company
      • John Steinhebel, project manager, Barton Malow Company

MLK SIT Agenda - 12/7/07

Committee reports:
Level 1--handout from Susan
Level 2--need to pick a date; we have two presenters for K-2 and two for 3-5
Building Project Committee

Plan for year:
  • Where did it come from?
  • Decision-making on SIT
Education Yes:
Addressing Diversity as it relates to the Education Yes! School Improvement Framework
  • Communication (Strand 4, Standard 1)
  • Outreach (Strand 2, Standard 2)
  • Academic Achievement
Brainstorm ways to collect input on communication, outreach, academic achievement issues related to diverse families?